Installation Of The Rail On The Master Guide Side

- Aug 02, 2019-

1\ Using a provisional datum plane


     Two blocks are fixed in close contact by the measuring plate ,A datum plane provided on the bed is used for straight alignment of the rail from one end to the other , Move the blocks and tighten the mounting bolts to the specified torque in sequence.



2\ Methos with use of a straight edge

 

       Use a dial gauge and a stragiht edge to confirm the straightness of the side datum plane of the rail from one end to the other , Make sure the mounting bolts are tightened securely in sequence.